NEW QUESTION # 69
What is the bend radius requirement for optical fiber cable when the cable is at rest?

  • A. 20 times the cables outside diameter
  • B. 15 times the cables outside diameter
  • C. 10 times the cables outside diameter

Answer: C


NEW QUESTION # 70
What is the primary difference between an Equipment Rack and a Cabinet, as referenced in BICSI documentation?

  • A. A rack provides open mounting rails, whereas a cabinet has doors or side panels for equipment protection
  • B. An equipment rack is used for fiber while a cabinet is used for copper only
  • C. Cabinets can only be installed on exterior walls, while racks are installed in the room interior
  • D. A cabinet requires no grounding or bonding, whereas a rack must be grounded

Answer: A


NEW QUESTION # 71
Which of the following is the first step of the emergency rescue process?

  • A. Survey the scene
  • B. Contact 911
  • C. Notify someone
  • D. Secure the area

Answer: A


NEW QUESTION # 72
What is the required physical topology for a SCS?

  • A. Bus
  • B. Ring
  • C. Tree
  • D. Star

Answer: D


NEW QUESTION # 73
When bonding a shielded twisted-pair cable system, which of the following must be ensured to comply with proper grounding and bonding practices?

  • A. The drain wire or shield foil is securely bonded to the connecting hardware or patch panel that is connected to the TGB/TMGB
  • B. Only the outer jacket is stripped back to expose the shield at the connector
  • C. The shield is folded back outside of the connector for easy visual inspection
  • D. The cable shield is bonded to a non-conductive anchor to prevent ground loops

Answer: A


NEW QUESTION # 74
You are installing a new equipment rack in a Telecommunications Room (TR). Which grounding practice aligns BEST with BICSI Installer 2 guidelines?

  • A. Grounding the rack to the building's structural steel using a #8 AWG copper conductor
  • B. Relying on the rack's anchor bolts into the concrete floor for grounding
  • C. Connecting the rack directly to the nearest water pipe for grounding
  • D. Bonding the rack to the telecommunications grounding busbar with a listed bonding conductor of appropriate size

Answer: D


NEW QUESTION # 75
Which of the following is the BEST description of a Consolidation Point (CP) in a modular furniture environment?

  • A. An external enclosure used for splicing fiber optic cables in the field
  • B. An interconnection point in the horizontal cabling subsystem, allowing reconfiguration of open office areas
  • C. A location within the patch panel where additional trunk cables connect
  • D. A dedicated grounding busbar for modular workstation power and data connections

Answer: B


NEW QUESTION # 76
Which of the following is a benefit of air-blown optical fiber cable?

  • A. It requires less testing than other types of cables
  • B. It can be recovered and reused
  • C. It is significantly cheaper than other types of cables

Answer: B


NEW QUESTION # 77
Which of the following is used to perform continuity and length tests for coaxial cable?

  • A. TDR (Time domain reflectometer) with an adapter
  • B. OTDR (optical time domain reflectometer
  • C. VFL (visual fault locator)
  • D. OLTS (optical loss test set)

Answer: A


NEW QUESTION # 78
A purple backboard should be used to identify ________?

  • A. Network connections
  • B. Demarcation point
  • C. Horizontal cable
  • D. Common equipment

Answer: D


NEW QUESTION # 79
During a fiber optic cable installation, the cable manufacturer specifies a maximum tensile load of 2700 N (600 lb). What is the TYPICAL recommended maximum pulling tension you should not exceed for short pulls, to ensure safety margins?

  • A. 810 N (180 lb)
  • B. 2700 N (600 lb)
  • C. 1350 N (300 lb)
  • D. 1890 N (425 lb)

Answer: C


NEW QUESTION # 80
Which of the following steps should be performed first when an installer is pulling backbone cable from the bottom up?

  • A. Label cables and reels
  • B. Verify the proper cable run
  • C. Determine appropriate rope size
  • D. Move cable reels into place

Answer: B


NEW QUESTION # 81
In a multi-story building, the Telecommunications Main Grounding Busbar (TMGB) is typically located
_______.

  • A. distributed in each tenant space for convenience
  • B. midway through the building for balanced potential
  • C. in or near the main electrical service entrance
  • D. on the top floor for easier bonding to rooftop antennas

Answer: C


NEW QUESTION # 82
Which of the Two organizations jointly oversee the worldwide standardization of telecommunications cabling?

  • A. Comite Europeen de Normalisation Electrotechnique (CENELEC) and Electronic Industries Association (EIA)
  • B. Alliance for Telecommunications Industry Solutions (ATIS) and Society for Cable Telecommunications Engineers (SCTE)
  • C. National Electrical Contractors Association (NECA) and National Fire Protection Association (NFPA)
  • D. International Organization for Standardization (ISO) and International Electrotechnical Commission (IEC)

Answer: D


NEW QUESTION # 83
Which of the following interconnects the PBB to the SBB?

  • A. TEBC
  • B. RBB
  • C. BBC
  • D. TBB

Answer: D


NEW QUESTION # 84
Which statement is TRUE concerning campus backbone installations between buildings that share a common building entrance facility?

  • A. Optical fiber cable should be grounded at both ends using a single conductor
  • B. Different shielded cable types can be directly bonded together without a grounding kit
  • C. Each building must independently ground its backbone cable to a separate earth ground
  • D. The best practice is to install at least two diverse pathways to allow for redundancy

Answer: D